facebook
Next Generation Yachting
Login
SearchSearch

Hatteras GT 59 Convertible 2021 "Change Order"

  • 59 ft
  • Convertible Boat
  • Stuart, FL, US

Yacht Price

3,199,000

Overview

 This 2021 HATTERAS 59' GT59 CONVERTIBLE "Change Order" is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines.  The engines are still under warranty and warranty can be extended out further.  All service is up to date on engines and generators with records.  The 2021 59' HATTERAS CONVERTIBLE is loaded with options and is in very nice condition.  Call to inquire for more information or schedule a showing on "Change Order" the 2021 HATTERAS 59' CONVERTIBLE GT59. Engine warranty until 12/7/2025 or 2,000hrs.

 

HIGHLIGHTS

  • CAT C32A engines with warranty until 12/7/2025 or 2000 hours
  • 2022 Garmin electronics package
  • 4/2022 Electrosea system added
  • 4/2022 KVH tracvision 7 HD tv added
  • 4/2022 JL Audio system with speakers, subwoofer, and amplifiers added
  • Two generators
  • Mezzanine seating in cockpit
  • Air conditioned flybridge
  • Bow thruster
  • Water maker
  • Ice chipper
  • Underwater lights
  • Sirius/XM weather & radio

Highlights

  • Manufacturer
    Hatteras
  • Model
    GT 59 Convertible
  • Year
    2021
  • LOA
    59 ft - 17.98 meter
  • Beam
    18 ft 9 in - 5.72 meter
  • Draft - max
    4 ft 9 in - 1.45 meter
  • Engine Brand
    Caterpillar
  • Engine Hours
    600
  • Number of Rooms
    3
  • Category
    Power
  • Condition
    Used
  • Location
    Stuart, FL, US
  • Vessel Name
    Change Order
  • Boat Type
    Convertible Boat
  • Hull Material
    Fiberglass
  • HIN:
    HATHU304K021
  • Flag of Registry
    US
  • Available for sale in U.S. waters
    Yes
  • Length
    59 ft - 17.98 meter
  • LOA:
    59 ft - 17.98 meter
  • Beam:
    18 ft 9 in - 5.72 meter
  • Draft - max:
    4 ft 9 in - 1.45 meter
  • Make:
    Caterpillar
  • Model:
    C-32A
  • Engine(s):
    2
  • Hours:
    600
  • Joystick Control:
    No
  • Engine Type:
    Inboard
  • Fuel Type:
    Diesel
  • Horsepower:
    1600 (Individual), 3200 (combined)
  • Fuel Tank:
    1750 gallons - 1 tank(s)
  • Fresh Water Tank:
    200 gallons - 1 tank(s)
  • Holding Tank:
    120 gallons - 1 tank(s)
  • Total Cabins:
    3
  • Total Heads:
    2
  • Captains Cabin:
    No
Vessel Details

Salon:

  • Satin teak woodwork throughout
  • L-shaped sofa with storage underneath and pull out double berth
  • Custom salon cocktail table with storage inside
  • Carpeting with carpet runner
  • Amtico threshold at entrance of salon door
  • Samsung 40" flatscreen tv to starboard with electric lift
  • Satellite tv
  • Denon AV receiver
  • Samsung blu ray player
  • Surround sound speakers
  • Sliding salon door
  • 110V outlets
  • Cabinet storage
  • AC distribution panel
  • Overhead lighting
  • Rope accent lighting

Galley/Dinette:

  • Amtico flooring in galley
  • Peninsula galley layout with optional dinette
  • Corian countertop with drop in sink with single lever faucet
  • Garbage disposal
  • 2 refrigeration under counter units (4 drawers total)
  • Miele 4-burner cooktop
  • U-line ice maker
  • Storage drawers & cabinets
  • Bottle storage to port
  • Overhead & Rope lighting
  • Microwave/convection oven covered by cabinet door

Companionway:

  • Carpeting with carpet runners
  • Overhead lighting
  • Access to port and starboard attic storage, electric panels with lighting
  • Access hatches to all bilges
  • NEW 2022 Haier Washer/dryer

Master Stateroom

  • Queen sized walkaround bed with storage underneath
  • Carpeting
  • Cedar lined hanging closet
  • Nightstands with drawers
  • 2 reading lamps
  • Overhead lighting
  • Rope lighting
  • Cabinet & drawer storage
  • 110V outlets
  • Samsung flatscreen tv & soundbar
  • Ensuite head

Master stateroom head

  • Separate shower stall
  • Corian countertop
  • Sink with faucet and storage underneath
  • Headhunter electric head
  • Towel racks
  • Mirror vanity with storage
  • 110v outlet
  • Overhead lighting
  • Amtico flooring

VIP Stateroom:

  • Queen sized island berth with storage underneath
  • Large drawer under bed
  • Cedar lined hanging locker
  • Overhead lockers to port & starboard
  • Flip up storage to port & starboard
  • Flatscreen tv
  • Overhead lighting
  • Carpeting
  • Overhead hatch with screen & privacy cover
  • 110v outlets
  • Ensuite head

VIP/Day head

  • Separate shower stall
  • Corian countertop
  • Sink with faucet and storage underneath
  • Headhunter electric head
  • Towel racks
  • Mirror vanity with storage
  • 110v outlet
  • Overhead lighting
  • Amtico flooring

Starboard Bunk Stateroom

  • Over/Under bed with storage under lower berth
  • Carpeting
  • Nightstands with storage
  • Reading lamps
  • Cedar lined hanging locker
  • Overhead lighting
  • Flatscreen tv
  • 110v outlets

Tackle room

  • Corian countertop
  • Rod/tackle storage
  • Cabinet storage
  • Overhead lighting
  • Amtico flooring

Flybridge

  • Center island helm
  • Large lounge forward of console with large freezer underneath
  • Bench sea to port & starboard with storage underneath
  • Air conditioning for flybridge
  • Storage port & starboard forward in cabinet
  • 4 cupholders forward
  • 3-sided enclosure
  • 5 rod rocket launcher on aft railing
  • Teak helm & companion seats with footrests
  • Aft LED spreader lights
  • Rupp triple spreader outriggers
  • Soundsystem with 6 JL Audio speakers
  • Zipwake trim tab control
  • Optimus steering display
  • ACR spotlight control
  • CAT active station display
  • Fuel gauges
  • Side power bow thruster
  • Single lever control with thruster buttons
  • Teak helm pod

Electronics:

  • 2 Garmin 8617 GPSMap 17" touch screen displays
  • Garmin 7" touchscreen display with C-zone system
  • Garmin open array radar
  • Garmin autopilot
  • Icom M506 vhf radio
  • 2 CAT engine displays
  • Hatteras systems display
  • AM/FM/SiriusXM/Bluetooth system through Garmin unit
  • Satellite tv

Cockpit:

  • 6 rod/ 2 cupholder/ drawer teak battle saddle
  • Custom oval table that fits on battle saddle
  • Mezzanine Seating with cushions
  • Large freezer in mezzanine seating
  • Storage in mezzanine step
  • Refrigerated drink box in cockpit step by salon door
  • Storage in mezzanine step to starboard
  • 6 gaff holder/chamois holders under gunnel
  • Saltwater/freshwater washdown
  • 50 amp shorepower cord on cablemaster
  • Fishbox to port with ice chipper dump
  • Fishbox to starboard
  • Large lazzarette, seakeeper ready
  • Teak covering boards
  • 6 in-gunnel rodholders
  • 6 Haunch clearing rodholders
  • Transom door with lift gate
  • Transom Live Well with window and lights
  • Eskimo Ice Machine in lazzarette
  • Electric Grill in Top of Mezzanine Tackle Center
  • Salon sliding door
  • JL Audio speakers
  • Lumitec underwater lights

Engine Room:

  • Twin Caterpillar C-32A 1600HP with 600hrs
  • Engine warranty until 12/7/2025 or 2,000hrs
  • 2 Cummins Onan Generators 21.5KW (Port 660 hours & Starboard 630 hours)
  • Electrosea system
  • 2 Mach5 freshwater pumps
  • Watermakers Inc watermaker
  • Oil change system
  • Eskimo Ice Machine
  • LED Engine Room Lights
  • SeaFire Fire Extinguishing System for Engine Room
  • 24V DC Bilge and Sump Pumps
  • Auxiliary Emergency Bilge Pump, 150GPM in Lazarette
  • 20-Gallon Electric Water Heater
  • Racor Fuel Filter/ Water Separator for both Engines, and Generators
  • Engine Start/ Stop Switches and Hour Meter
  • Automatic Battery Charger

Foredeck

  • Maxwell windlass with foot control
  • Anchor with chain & rope
  • Anchor locker with washdown


Disclaimer
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.

Next Generation Yachting operates as a Buyer Agent and is not the Listing Agent for the above yacht displayed on our Multiple Listings Search (MLS) system. Our aim is to provide a comprehensive and easy to use yacht listings database as a service to assist potential buyers in their purchasing process, without conveying representation of such listing. Our team's Buyer Agents services are readily available to you, should you require assistance with your purchase. Our expertise includes previewing yachts, preparing offers, organizing surveys and sea trials, and providing assistance with the closing process and beyond. If you would like to learn more about our Buyer Agent Services, please click here.
  • 2021 Hatteras 59GT

Location

Need more information? Please contact our Hatteras Yachts expert


Gallery

Our Services

Buying a Yacht

BUYER

REPRESENTATION

Learn more
Sell your Yacht

SELLER

REPRESENTATION

Learn more
Financing

YACHT

FINANCING

PRE-APPROVAL

 

Similar Yachts For Sale

Generating PDF

Close

Contact Us

Contact Details

Next Generation Yachting

1815 Purdy Ave
Miami Beach, FL 33139

+1 786.246.9873

[email protected]

Online Inquiry

Search Yachts by Brand


  1. Absolute Yachts
  2. Absolute Yachts for sale in Florida
  3. Astondoa Yacht for sale in Florida
  4. Astondoa Yachts
  5. Atlantis Yachts
  6. Axopar Boats
  7. Azimut Yachts
  8. Azimut Yachts for sale in Florida
  9. Benetti Yachts
  10. Benetti Yachts for sale in Florida
  11. Bertram Yachts
  12. Boston Whaler
  13. Cabo Yachts
  14. Canados Yachts
  15. Cigarette Boats
  16. Cigarette Boats for sale in Florida
  17. Cigarette Boats for sale in Florida
  18. Cruisers Yachts for sale
  19. Fairline Yachts
  20. Ferretti Yachts
  21. Ferretti Yachts for sale in Florida
  22. Fjord Boats
  23. Flemings Yachts
  24. Galeon Yachts
  25. Galeon Yachts for sale in Florida
  26. Guy Couach Yachts
  27. Hampton Yachts
  28. Hampton Yachts for sale in Florida
  29. Hatteras Yachts
  30. HCB Boats
  31. Hinckley Boats
  32. Hinckley Boats for sale in Florida
  33. Horizon Yachts
  34. Intrepid Boats
  35. ISA Yachts
  36. Jetcar
  37. Lagoon Catamarans for sale in Florida
  38. Lazzara Yachts
  39. Lazzara Yachts for sale in Florida
  40. Leopard Yachts
  41. Mangusta Yachts
  42. Maritimo Yachts
  43. Marlow Yachts
  44. Midnight Express Boats
  45. Monte Carlo Yachts
  46. MTI Boats
  47. MTI Boats for sale in Florida
  48. Nor-Tech Boats
  49. Numarine Yachts
  50. Ocean Alexander Yachts
  51. Ocean Alexander Yachts for sale in Florida
  52. Pardo Yachts
  53. Pershing Yachts
  54. Pershing yachts for sale in Florida
  55. Prestige Yachts
  56. Prestige Yachts for sale in Florida
  57. Princess Yachts
  58. Princess Yachts for sale in Florida
  59. Riva Yachts
  60. Riva Yachts for sale in Florida
  61. Riviera Yachts
  62. Sanlorenzo Yachts
  63. Sanlorenzo Yachts for sale in Florida
  64. Sea Ray Yachts
  65. Sea Vee Boats
  66. Sunreef Catamarans for sale in Florida
  67. Sunseeker Yachts
  68. Sunseeker Yachts for sale in Florida
  69. Tiara Yachts
  70. Viking Yachts
  71. Viking Yachts fort sale in Florida
  72. Westport Yachts
  73. Westport Yachts for sale in Florida
  74. Yellowfin Boats
Close Success

Thank You


If you would like to improve your browsing experience and save your preferences, sign up or log in to your account.

Top